Table and docking station for Milan Lonetier
The first project!
The collaboration with Milan Luzier has a special place in the history of The French Vikings. This is the first tailor-made project for which our concrete has been honored.
This project brings together two major creations and it is fully realized in pressed concrete, the "Rolls-Royce" of concretes. The first piece is a docking station made from 2.20m x 3m. One of the work plans that composes this structure welcomes a sink. At the back of the shop, we made a 2.4m table with 0.8m large, the base of the tray is circked by a varnished wooden structure. The whole is supported by a 1,20m solid concrete foot by 0.6m.
The wooden structures were performed by Necha carpentry.
Project ID line
What: Table and countertop with washbasin
Date: Fall 2015
Time : 1 month
Destination : Paris - Bastille
Weight: 400 kg
Number of units: 2 units composed of several pieces assembled